What is included

What Is Included in Our Solar System Installation

  • We look at the roof, the direction it faces and shade from trees, and note the state of the roofing.
  • We inspect the switchboard and meter box to see whether the main switch and spare space suit a solar supply.
  • Mounting rails are fixed to the roof rafters with flashed brackets, so the roof stays watertight.
  • Panels are clamped onto the rails and joined in strings with the plug-in leads fitted to each one.
  • DC cable runs from the roof through conduit to the inverter, which is fixed to a shaded wall.
  • We fit isolators on the DC side at the roof and on the AC side at the switchboard.
  • AC cable runs from the inverter to its own breaker in the switchboard.
  • We commission the inverter, check it connects to the grid and read the first output from the panels.

Why us

Why Choose Us for Solar System Installation?

Accountable for every job, long after the day

Every solar system installation job is done by the people who will still be here next year.

Tested and signed off before we leave

Everything we touch on your solar system installation is tested before we go, you get walked through exactly what was done.

Local electricians, not a call centre

An electrician answers the phone and the same faces come back if the job runs over a day.

How the job runs

Roof and board both matter

01

Tell us about roof and bills

Tell us what the roof is made of, which way it faces and whether trees shade it. Send a recent power bill so we can see when you use the most electricity. We also ask how old the switchboard is, since the solar supply connects there.

02

Sizing panels and finding space

We pick the roof area for the panels and a shaded wall near the board for the inverter. Then we plan the cable route from the roof down to the board. How many panels fit depends on the roof, so we confirm that on site.

03

Mounting, wiring and switching on

Rails go onto the roof first, then the panels, then the cable down to the inverter. At the switchboard we add a breaker and isolators. Finally we switch the system on and watch the inverter start up and begin sending power.

Common questions

Frequently Asked Questions

What should I send before someone visits?

A short description of what is happening and which suburb you are in is the main thing. A photo of the switchboard with the cover closed, and one of the spot where the work is needed, lets us see the age of the installation and the layout. If an appliance or unit is involved, send its make and model.

How do I describe a fault over the phone?

Say which room or circuit is affected and what you noticed first, such as lights flickering, a switch tripping or a smell of burning. Mention whether it happens all the time or only when a particular appliance is running. If there is smoke, fire or someone has been hurt, call 000 first.

What days and hours are you open?

We are open Monday to Friday, 7:30am to 4pm, and closed on Saturday and Sunday. You can call 0468 051 006 or email enquires@switchedonelectrical.com.au. If you email, put your suburb and what is going on in the first lines.

Which areas do you cover?

We are based in Ballina and work across the Northern Rivers. That includes Lennox Head, Skennars Head, Alstonville, Wollongbar, Byron Bay, Bangalow, Lismore, Mullumbimby, Woodburn, Evans Head and Broadwater. If you are somewhere nearby, call and ask.

What does a switchboard upgrade involve?

The power is switched off, the old board is taken out and a new board goes in with the circuits moved across. Safety switches are fitted to the circuits and each circuit is labelled. Older boards sometimes hide extra wiring, which becomes visible once the cover is off.

Can a power point be added where I need one?

Usually, yes. It depends on where the nearest circuit is, whether that circuit can carry the extra load, and how the cable can reach the spot through the roof space, the wall cavity or under the floor. A photo of the wall and a note of what you want to plug in is enough to start.

What if my safety switch keeps tripping?

Unplug everything on the affected circuit and reset the switch once. If it holds, plug appliances back in one at a time, since a faulty appliance is a common cause. If it trips again with nothing plugged in, leave it off and call us, because the fault is in the wiring or a fitting.

What do I need to know about smoke alarm basics?

Alarms belong in hallways and near bedrooms, and interconnected alarms sound together when one detects smoke. Mains powered alarms with a battery backup are common in newer homes. Most alarms have a date printed on the back, so check it, and call us if yours is old or does not sound when tested.

How are data points run?

A network cable, usually Cat6, runs from a central point such as a patch panel or a rack to a wall outlet in each room. It goes through the roof space or wall cavity, is terminated at both ends and is tested. Tell us which rooms need a point and where the router or rack will sit.

Do you work with solar and batteries?

Yes. Solar system installation and battery installation are both on our list of work. Both connect through the switchboard and meter box, so a photo of those and the make of any inverter or battery you have in mind is a useful start.

What is involved in an EV charger install?

The charger needs its own circuit from the switchboard, and the cable has to run from the board to wherever the car parks. We look at the board for spare space and at the distance to the garage or carport. Send a photo of the board and the make and model of the charger.

What should I know before an air conditioner install?

Decide which room the unit serves and where the outdoor unit can sit, since the pipes and cable have to connect the two. The switchboard needs a circuit with enough capacity for the unit. Send the make and model if you have chosen one, and a photo of the board and the wall where the indoor unit will go.

Ready when you are

Book Solar System Installation in Ballina Today

Send a photo of the roof from the street and one of the switchboard with the cover closed. Add the direction the main roof faces, if you know it.

0468 051 006

Monday to Friday 7:30am to 4pm

Not urgent? Send us the job instead